Eltrode delivers to HENT and Police Station ENØ

Eltrode delivers to HENT and Police Station ENØ

Emission-free mobile heat pumps for construction heating and drying

Eltrode AS delivered emission-free mobile electric heat pumps and LED lighting to the new police headquarters in east Oslo — a landmark building at Kjelsrud with high demands for progress, safety and sustainability. The solution provided efficient and emission-free heating and drying throughout the construction period, without the use of fossil fuels.

Benefits for the police headquarters

  • Emission-free heating and digital control during construction
  • Up to 68% lower energy costs compared to traditional solutions
  • Rapid and stable drying of concrete and structures
  • Operational reliability at low temperatures (down to −25°C)
  • Full automation and plug-and-play installation
  • HSE maintained, low noise levels, no indoor cabling

Result

Eltrode's heat pumps ensured rapid progress and optimal construction site logistics, while the project contributed to Oslo's ambition of emission-free construction activity. The police station was completed in 2025 and becomes a central part of the police's future infrastructure in the capital.

Flere referanser